Testing the Electrical Safety Aspects of The Emergency Shut Down Multi Indicator (Esin) Innovation Tool for Refueling De-Refueling Trucks (RDT) at The Mutiara Palu Aircraft Filling Depot

Authors

  • Ratih Mar'atus Sholihah Electrical Engineering Study Program, Faculty of Engineering, Tadulako University, Palu, Indonesia
  • Irwan Mahmudi Electrical Engineering Study Program, Faculty of Engineering, Tadulako University, Palu, Indonesia
  • Lutfiyana Andi Anshar Electrical Engineering Study Program, Faculty of Engineering, Tadulako University, Palu, Indonesia

DOI:

https://doi.org/10.35568/abdimas.v7i2.4622

Keywords:

Refueling De-refueling Truck (RDT), Emergency Shut-Down Multi-Indicator, safety, electrical aspects

Abstract

As the commercial and trading subholding of PT Pertamina (Persero), Pertamina Patra Niaga also provides aviation fuel to airlines. The aviation fuel refueling place is called the Aircraft Refueling Depot. One of the aircraft filling depots in Palu is the Mutiara Aircraft Filling Depot, located in the Mutiara Sis Al-Jufri Airport Area. The Mutiara Aircraft Refueling Depot uses a Refueling De-Refueling Truck (RDT) to fill aircraft with fuel while on the ground. This refueler unit can also pump and store fuel from aircraft. One of the problems when refueling aviation fuel by RDT at the Mutiara Aircraft Filling Depot was the activation of the emergency stop when the Certified Refueler Operator (CRO) was carrying out the service. The aviation fuel-filling system stopped without anyone realizing it, causing flight delays. The active emergency stop without a clear indicator initiates the FT Prove Pin Point group to create an Emergency Shut-Down Multi-Indicator (ESIn) tool that can monitor the active status of the emergency fuel or engine stop. Before the ESIn tool is used, one of the steps that must be carried out is a feasibility test on electrical safety aspects. Testing is carried out using three criteria, namely visual testing, component electrical parameters, and performance. Based on visual and performance testing, the tool is in good condition and can operate according to the planned purpose. Likewise, when testing component electrical parameters, the measured parameter values show values according to applicable electrical standards.

Downloads

Download data is not yet available.

References

Badan Standarisasi Nasional (BSN). (2014). Persyaratan Umum Instalasi Listrik 2011 (2014th ed.). Standar Nasional. Indonesia (SNI).

Eryomina, T. V., Galeguzova, I. A., Shanygin, I. A., Dasheev, D. E., & Aleksandrov, N. V. (2022). To the problem of technogenic safety of electrical installations at the objects. AIP Conference Proceedings, 2762. https://doi.org/10.1063/5.0128707

Galih Firdaus, A., & Hidayat, R. (2021). Analisa Pengujian Kelayakan Operasi Pemutus Tenaga (PMT) 150 kV Bay Penghantar Mandirancan I Berdasarkan Parameter Breaker Analyzer di Gardu Induk Sunyaragi. ELECTRICIAN – Jurnal Rekayasa Dan Teknologi Elektro, 15(3), 252–267.

Hermanu, C., & Apribowo, B. (2019). Study Analysis of Voltage Drop in a Typical Office Building Lighting System: A Case Study of of FEM IPB Building Electrical Installation. Journal of Electrical, Electronic, Information, and Communication Technology (JEEICT), 1(1), 26–31.

Hidayat Dongka-, R., Akmal Hidayat-, M., Elektronika, P., & Teknologi Industri Dewantara Palopo, A. (2022). Evaluasi Instalasi Listrik Gedung Perkantoran dengan Metode Standarisasi Puil 2011. DEWANTARA. J. Tech, 03(02).

Technical Committtee 64. (2016). IEC 60364-6 (2nd ed., Vol. 4).

Khalikov, S., Khalikov, S., Rahmatov, D., Atazhiyev, S., & Bakizhanov, A. (2022). Issues of Reliability and Safety of an Electrical Substation. AIP Conference Proceedings, 2552. https://doi.org/10.1063/5.0117214

Nada Fitsa Alfazumi1, W. S. W. Y. (2020, December 1). Uji Kelayakan Instalasi Listrik di Universitas Bangka Belitung Berdasarkan PUIL 2011 (Studi di Gedung Fakultas Teknik). Seminar Nasional Teknologi Informasi, Komunikasi Dan Industri (SNTIKI) 12.

Nurma Heitasari, D., & Daffa Al Fayyadh, M. (2022). ANALISIS UTILITAS REFUELLER DALAM OPERASI PENYALURAN DI DPPU A PT P. SNTEM, 2, 1056–1063.

Olesz, M., Litzbarski, L. S., & Redlarski, G. (2023). Leakage Current Measurements of Surge Arresters. Energies, 16(18). https://doi.org/10.3390/en16186480

Paul Gill. (2008). Electrical Power Equipment Maintenance and Testing (Power Engineering) 2nd Edition. CRC Press.

Tim Independen Pengendalian Keselamatan Migas. (2017). ATLAS Keselamatan MIGAS (Vol. 2). Direktorat Jenderal Minyak dan Gas Bumi.

Tunnisa, K., Rahman, R., Alvian, ), Putra, T., Mar’atuttahirah, ), Rosmiati, ), Hakim, L., Fahrisal, J., Akmal, ), Syam, B., Bacharuddin, ), & Habibie, J. (2024). Microsoft Project Application in Optimizing Activities for Compiling Activity Programs at the Lapadde Village Office. 1, 52–57. https://doi.org/10.35568/abdimas.v7i1.4173

Utami, A. M. S., Syakur, A., & Hermawan, H. (2021). Analysis of Leakage Current and Insulator Resistivity for Quality Assurance of Medium Voltage Network Polymer Insulators Alumina - SiO2 in Tropical Climate Simulator Room. TEKNIK, 42(1), 10–19. https://doi.org/10.14710/teknik.v42i1.36152

Yusniati, Z., & Pelawi, T. (n.d.). PENGUKURAN RESISTANSI ISOLASI INSTALASI PENERANGAN BASEMENT PADA GEDUNG RUMAH SAKIT GREND MITRA MEDIKA MEDAN. In Cetak) Buletin Utama Teknik (Vol. 16, Issue 3).

Downloads

Published

2024-04-30

How to Cite

Ratih Mar'atus Sholihah, Irwan Mahmudi, & Lutfiyana Andi Anshar. (2024). Testing the Electrical Safety Aspects of The Emergency Shut Down Multi Indicator (Esin) Innovation Tool for Refueling De-Refueling Trucks (RDT) at The Mutiara Palu Aircraft Filling Depot. ABDIMAS: Jurnal Pengabdian Masyarakat, 7(2), 528–535. https://doi.org/10.35568/abdimas.v7i2.4622